How to Prepare Your Home and Yourself for a Major Reno
- Jacob Postma
- Jul 8, 2025
- 5 min read
By Build Now Construction | Build Wise Center
The Reality Behind the Dream
You’ve watched the renovation shows. You’ve pinned your dream kitchen. Maybe you’ve even paced your basement imagining a future media room or income suite. But before you knock down that first wall or bring in a crew, it’s time for some honest talk: a major renovation isn’t just about transforming your space—it’s about preparing your mind, budget, and home for the journey ahead.
At Build Now Construction’s Build Wise Center, we’ve seen homeowners come in excited and leave educated. This guide will help you join that club. With real 2025 home renovation costs, step-by-step remodeling preparation tips, and expert insight on ROI for renovations and the Ontario building permit process, this isn’t just theory—it’s renovation reality. And by the end of it, you’ll be ready to build smart and live better.
1. Define the Goal: Lifestyle or Investment?
Before you swing a hammer or open your wallet, ask yourself one key question: why are you renovating?
Is this a lifestyle renovation?
You plan to stay 5+ years
You want more comfort or functionality
You’re focused on layout and flow, not resale
Is this an investment renovation?
You plan to sell within 1–3 years
You’re looking for maximum return on investment (ROI)
You want finishes that appeal to buyers or renters
Your “why” will shape every decision—from materials to layouts to timelines. A lifestyle reno is all about customization. An investment reno is about mass appeal and cost control.
2. What It Really Costs to Renovate in Ontario (2025)
Home renovation costs in Ontario have continued to rise. Material costs, labour shortages, and inflation have pushed 2025 home renovation prices higher than many homeowners expect.
Here’s a breakdown of average 2025 Ontario renovation pricing:
Renovation Type | Average Cost (Mid-tier Finishes) |
Finished basement | $140–$160 per sq. ft. (avg. $150/sq. ft.) |
Kitchen remodel | $40,000–$80,000+ |
Bathroom remodel | $30,000-$35,000+ |
Main floor gut and rebuild | $180–$250 per sq. ft. |
Second-story addition | $300+ per sq. ft. |
Mid-tier finishes typically include:
Durable LVP or engineered hardwood flooring
Quartz countertops
Quality cabinetry (not custom millwork)
Pot lights and recessed lighting
Painted drywall with trim
Budget tip: Always factor in 15–20% contingency for surprises like outdated wiring, asbestos, or structural issues—especially in older homes.
3. ROI: How Home Renovations Add Value in 2025
If your renovation is also an investment, it’s important to understand which upgrades offer the best return.
Common ROI Ranges (2025 Ontario Housing Market):
Finished basement: Up to 30% home value boost
Legal basement suite: $1,500–$2,200/month in rental income
Kitchen renovation: 75–90% ROI
Bathroom renovation: 60–80% ROI
Adding livable square footage: Highly increases property appraisals
A finished basement can increase your home's resale value especially if it includes a legal suite, egress windows, and its own bathroom or kitchen.
4. Understanding the Ontario Permit Process for Home Renovations
This is where many homeowners run into issues. The permit process in Ontario isn’t just paperwork—it’s protection and legal compliance.
When You Need a Permit in Ontario:
Structural changes (walls, windows, foundation supports)
Electrical or plumbing modifications
Basement finishing with bedrooms or bathrooms
Additions, decks, or exterior alterations
What You'll Need:
Architectural drawings and floor plans
Property survey or site plan
Engineer’s reports for structural elements
Building permit application to your local municipality
Typical Permit Timelines (2025):
Most Ontario municipalities require 4–8 weeks to process home renovation permits. Some cities offer online portals for easier submission and tracking.
Warning: Skipping permits can result in fines, rejected home insurance claims, and major complications when selling your home.
Build Wise Tip: Choose a contractor who handles permits for you and ensure this is written into your renovation contract.
5. How to Choose the Right Contractor for a Major Renovation
Hiring the right contractor is critical for the success of your home renovation project.
Must-Have Credentials:
WSIB coverage and liability insurance
Local references and positive online reviews
A clear, written contract outlining scope, payment schedule, and timeline
A professional estimate that includes all major cost elements
Warranty or service guarantee for workmanship
Pro Tip: In 2025, it’s normal and encouraged for reputable contractors to charge for detailed estimates. This ensures you get accurate, realistic pricing and not a rushed guess.
6. Preparing Your Home for a Renovation Project
Renovations are messy, noisy, and disruptive. Prepare your home for construction to minimize stress and protect your belongings.
General Steps:
Remove or safely store valuables, electronics, and fragile items
Install dust barriers and protective floor coverings (e.g., RAM board)
Move furniture out of work areas
Notify neighbours if construction will cause noise or street blockage
Room-Specific Tips:
Kitchen: Set up a temporary meal prep zone
Bathroom: Rent a portable toilet if you only have one bathroom
Basement: Dehumidify the space and elevate stored items
Whole house: Consider temporary relocation if noise or dust is overwhelming
7. Preparing Yourself Mentally for a Major Reno
The emotional toll of a major renovation is often underestimated.
Mental Preparation Tips:
Keep open, regular communication with your contractor
Accept delays as part of the process
Take reno breaks—go out, see friends, and disconnect
Document progress through photos (great for peace of mind and resale)
Living through a reno can feel like indoor camping. Expect dust, shifting routines, and a constant buzz of activity.
8. Expect the Unexpected: Managing Renovation Surprises
Common Renovation Surprises:
Unforeseen structural issues (e.g., water damage, load-bearing beams)
Delays in material shipments
Permit changes or inspections
Always keep a 15–20% renovation contingency fund for emergencies. Surprises are common, but they don’t have to derail your entire project if you’ve planned ahead.
9. Final Walkthrough, Deficiency Check, and Holdbacks
Once your renovation is “finished,” it’s not truly complete until you:
Walk through with your contractor
Inspect every area for flaws or missing items (paint touch-ups, missing trim, loose hardware)
Create a punch list for fixes
Withhold 10% final payment until all deficiencies are corrected (per Ontario lien law)
Holdbacks protect you from unfinished work and future contractor claims.
10. After the Reno: Maximize Your New Space and ROI
Now that the dust has settled:
Enjoy your upgraded space
Organize receipts, warranties, paint codes, and contractor info
Update your home insurance with the new appraised value
Consider rental income if you’ve added a legal basement suite
This is the part where your smart planning pays off—literally and emotionally.
11. Build Smart with Build Now Construction
Whether you’re renovating for yourself, your family, or your financial future, the key to success is smart planning and expert execution.
📌 Explore more renovation guides, real cost breakdowns, and planning tips at the Build Wise Center.
📞 Ready to take the next step? Book a consultation with Build Now Construction and let’s talk about your home renovation goals.
Build smart. Live better. Build Now.



Comments